Panel Upgrade in Hudson County, NJ
Malfettone Electric has been upgrading electrical panels in Hudson County for nearly 50 years. Whether you have a Federal Pacific Stab-Lok, a Zinsco, an undersized 100A panel, or a service entrance that needs full replacement, we handle everything — permit, utility coordination, inspection, and Certificate of Approval. Most panel upgrades start and finish the same day.
Everything in a Full Panel Upgrade — No Hidden Costs
Every Malfettone Electric panel upgrade includes the panel, breakers, all required connections, permit application and coordination, and the final inspection. We do not sub out any part of the job. One crew, one permit, one point of contact.
Panel Upgrade Cost in Hudson County
Prices reflect Hudson County market rates including permit fees. Final quote provided in writing after free estimate. Full pricing guide →
Is Your Panel One of These? We Replace Them All.
These panel brands are found throughout Jersey City, Hoboken, and Bayonne rowhouses and brownstones. They have known safety defects and NJ insurance carriers are increasingly refusing to cover them.
Breakers fail to trip during overloads at rates far above industry standards. The most common dangerous panel in Hudson County.
Learn more →Breakers melt onto the bus bar, preventing them from tripping at all. Found in many Bayonne and Jersey City homes from this era.
Learn more →Push-button breakers that fail to reset and trip poorly. Parts are no longer manufactured, making repair impractical.
Learn more →Panel Upgrade Questions — Hudson County
A 200A panel upgrade in Hudson County typically costs $3,500–$5,500, including the new panel, breakers, permit, and inspection. If the service entrance cable or meter socket also needs replacement, add $800–$1,500. FPE or Zinsco panel replacements are in the same range. We provide written quotes — no surprises.
Yes. All panel upgrades and replacements in New Jersey require an electrical permit under the NJ Uniform Construction Code. Malfettone Electric pulls every permit and coordinates the final inspection. The permit protects you legally and ensures the work is covered by your homeowner's insurance.
The electrical work itself takes 4–8 hours for a full 200A panel replacement with an experienced crew. Add 3–10 business days for the municipal permit and 2–5 days to schedule the final inspection. Total timeline from signing to Certificate of Approval is typically 2–4 weeks.
Yes, if your service entrance or meter socket is also being replaced, we coordinate with PSE&G to disconnect and reconnect the meter. This adds 1–2 weeks to the overall timeline but does not cost you extra beyond our labor. We handle all PSE&G coordination and the ESI application when required.
Federal Pacific Stab-Lok panels have the words 'Stab-Lok' or 'FPE' on the breakers and are very common in Hudson County homes built from the 1950s through the 1980s. Zinsco panels have a colorful bus bar visible inside. Both are known fire hazards and most NJ insurance carriers are now refusing to insure homes with them. We can identify your panel brand during a free estimate.
Yes. In most cases, we reconnect all existing circuits to the new panel without replacing branch circuit wiring. We also use this opportunity to correct any double-taps, add AFCI or GFCI breakers required by current NJ code, and properly label every circuit in the new panel directory.
Ready for a Panel Upgrade in Hudson County?
We serve all of Hudson County — Jersey City, Hoboken, Bayonne, Union City, Weehawken, North Bergen, Guttenberg, West New York, and Secaucus. Free written estimate before any work begins. Most panel upgrades start and finish the same day.
NJ Electrical Contractor License #17130 · Family-owned since 1977 · 4.9★ · 124+ reviews