📞 Call📅 BookEstimate
📍 Essex County · 07042

Electrical Panel Upgrade in Montclair, NJ

Montclair's gracious older Victorians, colonials, and center-hall homes often still run on original or early-replacement panels that can't keep up with central AC, EV chargers, and modern kitchens. Malfettone Electric handles 200A panel and service upgrades across Montclair, coordinating permits through the Township and routing new service cleanly on historic-district homes.

NJ Licensed & Insured
Permits Pulled
PSE&G Coordinated
4.9★ · 124 Reviews
✍️ By Michael Malfettone, Licensed Master Electrician📋 NJ Electrical Contractor License #17130🕐 Last updated May 2026
Why Montclair Chooses Malfettone

The Panel Upgrade Specialists in Montclair, NJ

Since 1977, Malfettone Electric has been Hudson County's trusted electrical contractor for panel upgrades and service changes. We've upgraded hundreds of panels across Montclair— handling everything from the permit application to the PSE&G reconnect, so you don't have to coordinate anything yourself.

We pull Montclair permits — you don't lift a finger
PSE&G and JCPL scheduling handled for you
Free written estimate before any work starts
1-year labor guarantee on all panel work
4.9★ across 124 Google reviews
Same-day emergency response available
Panel Upgrade Process
01
Free In-Home Estimate
We visit, assess your panel and load, and give you a written quote — same day.
02
Permit Filed
We file for the electrical permit with Montclair's building department.
03
PSE&G Scheduled
We coordinate meter disconnect on your install day.
04
Upgrade Completed
New panel, all circuits transferred, load balanced — typically one day.
05
Inspection & Sign-Off
Municipal inspector signs off. You get the permit record.
Common Questions

Panel Upgrade FAQs — Montclair, NJ

How much does a panel upgrade cost in NJ?
Most panel upgrades in New Jersey range from $3,500 to $4,800 depending on the existing service size, panel brand, and whether a new meter socket is required. A 100A to 200A upgrade typically includes the panel, all breakers, labor, permit, and PSE&G coordination.
Do I need a permit for a panel upgrade in New Jersey?
Yes — all panel upgrades in New Jersey require an electrical permit from your local building department. Malfettone Electric pulls all permits on your behalf and schedules the final inspection. We handle the paperwork so you don't have to.
How long does a panel upgrade take?
Most residential panel upgrades are completed in one day. Permit processing and inspection scheduling typically adds 1–2 weeks. We coordinate with PSE&G or JCPL to reconnect service, minimizing your downtime.
Will my power be off during the panel upgrade?
Yes, your power will be off for several hours on the day of the upgrade while we replace the panel and transfer all circuits. PSE&G disconnects and reconnects the meter. Most jobs are completed with power restored the same day.
What is a 200 amp service upgrade?
A 200A service upgrade increases the total electrical capacity coming into your home from 60A or 100A to 200A. This is necessary before adding an EV charger, solar system, whole-home generator, or additional HVAC. It involves replacing the panel, breakers, and often the meter socket.

Ready for a Panel Upgrade in Montclair?

Call or request online. We'll come out to Montclair, assess your panel, and give you a written quote — same day. No pressure, no surprises.